资源类型

期刊论文 223

年份

2023 14

2022 14

2021 15

2020 15

2019 24

2018 11

2017 11

2016 10

2015 19

2014 12

2013 11

2012 19

2011 9

2010 5

2009 6

2008 5

2007 6

2006 3

2005 2

2004 4

展开 ︾

关键词

不确定性 9

DX桩 6

不确定性评估 2

承载力 2

智能制造 2

沉降 2

病毒载量 2

FLTD型脉冲加速器 1

GA-ANFIS模型 1

L唱M算法 1

MCMC 1

PAM 1

SCEM-UA 1

copula 1

三台阶七步开挖法 1

三塔悬索桥 1

三峡升船机 1

不确定性与裕度的量化 1

不确定性信息 1

展开 ︾

检索范围:

排序: 展示方式:

Shape design of arch dams under load uncertainties with robust optimization

Fengjie TAN, Tom LAHMER

《结构与土木工程前沿(英文)》 2019年 第13卷 第4期   页码 852-862 doi: 10.1007/s11709-019-0522-x

摘要: Due to an increased need in hydro-electricity, water storage, and flood protection, it is assumed that a series of new dams will be build throughout the world. The focus of this paper is on the non-probabilistic-based design of new arch-type dams by applying means of robust design optimization (RDO). This type of optimization takes into account uncertainties in the loads and in the material properties of the structure. As classical procedures of probabilistic-based optimization under uncertainties, such as RDO and reliability-based design optimization (RBDO), are in general computationally expensive and rely on estimates of the system’s response variance, we will not follow a full-probabilistic approach but work with predefined confidence levels. This leads to a bi-level optimization program where the volume of the dam is optimized under the worst combination of the uncertain parameters. As a result, robust and reliable designs are obtained and the result is independent from any assumptions on stochastic properties of the random variables in the model. The optimization of an arch-type dam is realized here by a robust optimization method under load uncertainty, where hydraulic and thermal loads are considered. The load uncertainty is modeled as an ellipsoidal expression. Comparing with any traditional deterministic optimization method, which only concerns the minimum objective value and offers a solution candidate close to limit-states, the RDO method provides a robust solution against uncertainty. To reduce the computational cost, a ranking strategy and an approximation model are further involved to do a preliminary screening. By this means, the robust design can generate an improved arch dam structure that ensures both safety and serviceability during its lifetime.

关键词: arch dam     shape optimization     robust optimization     load uncertainty     approximation model    

Robust topology optimization of multi-material lattice structures under material and load uncertainties

Yu-Chin CHAN, Kohei SHINTANI, Wei CHEN

《机械工程前沿(英文)》 2019年 第14卷 第2期   页码 141-152 doi: 10.1007/s11465-019-0531-4

摘要: Enabled by advancements in multi-material additive manufacturing, lightweight lattice structures consisting of networks of periodic unit cells have gained popularity due to their extraordinary performance and wide array of functions. This work proposes a density-based robust topology optimization method for meso- or macro-scale multi-material lattice structures under any combination of material and load uncertainties. The method utilizes a new generalized material interpolation scheme for an arbitrary number of materials, and employs univariate dimension reduction and Gauss-type quadrature to quantify and propagate uncertainty. By formulating the objective function as a weighted sum of the mean and standard deviation of compliance, the tradeoff between optimality and robustness can be studied and controlled. Examples of a cantilever beam lattice structure under various material and load uncertainty cases exhibit the efficiency and flexibility of the approach. The accuracy of univariate dimension reduction is validated by comparing the results to the Monte Carlo approach.

关键词: robust topology optimization     lattice structures     multi-material     material uncertainty     load uncertainty     univariate dimension reduction    

A refined risk explicit interval linear programming approach for optimal watershed load reduction withobjective-constraint uncertainty tradeoff analysis

Pingjian YANG,Feifei DONG,Yong LIU,Rui ZOU,Xing CHEN,Huaicheng GUO

《环境科学与工程前沿(英文)》 2016年 第10卷 第1期   页码 129-140 doi: 10.1007/s11783-014-0683-8

摘要: To enhance the effectiveness of watershed load reduction decision making, the Risk Explicit Interval Linear Programming (REILP) approach was developed in previous studies to address decision risks and system returns. However, REILP lacks the capability to analyze the tradeoff between risks in the objective function and constraints. Therefore, a refined REILP model is proposed in this study to further enhance the decision support capability of the REILP approach for optimal watershed load reduction. By introducing a tradeoff factor ( ) into the total risk function, the refined REILP can lead to different compromises between risks associated with the objective functions and the constraints. The proposed model was illustrated using a case study that deals with uncertainty-based optimal load reduction decision making for Lake Qionghai Watershed, China. A risk tradeoff curve with different values of was presented to decision makers as a more flexible platform to support decision formulation. The results of the standard and refined REILP model were compared under 11 aspiration levels. The results demonstrate that, by applying the refined REILP, it is possible to obtain solutions that preserve the same constraint risk as that in the standard REILP but with lower objective risk, which can provide more effective guidance for decision makers.

关键词: refined risk explicit interval linear programming     decision making     objective-constraint uncertainty tradeoff     aspiration level     Lake Qionghai Watershed    

MPC-based interval number optimization for electric water heater scheduling in uncertain environments

Jidong WANG, Chenghao LI, Peng LI, Yanbo CHE, Yue ZHOU, Yinqi LI

《能源前沿(英文)》 2021年 第15卷 第1期   页码 186-200 doi: 10.1007/s11708-019-0644-9

摘要: In this paper, interval number optimization and model predictive control are proposed to handle the uncertain-but-bounded parameters in electric water heater load scheduling. First of all, interval numbers are used to describe uncertain parameters including hot water demand, ambient temperature, and real-time price of electricity. Moreover, the traditional thermal dynamic model of electric water heater is transformed into an interval number model, based on which, the day-ahead load scheduling problem with uncertain parameters is formulated, and solved by interval number optimization. Different tolerance degrees for constraint violation and temperature preferences are also discussed for giving consumers more choices. Furthermore, the model predictive control which incorporates both forecasts and newly updated information is utilized to make and execute electric water heater load schedules on a rolling basis throughout the day. Simulation results demonstrate that interval number optimization either in day-ahead optimization or model predictive control format is robust to the uncertain hot water demand, ambient temperature, and real-time price of electricity, enabling customers to flexibly adjust electric water heater control strategy.

关键词: electric water heater     load scheduling     interval number optimization     model predictive control     uncertainty    

Modeling the impact of uncertainty in emissions trading markets with bankable permits

Yongliang ZHANG, Bing ZHANG, Jun BI, Pan HE

《环境科学与工程前沿(英文)》 2013年 第7卷 第2期   页码 231-241 doi: 10.1007/s11783-012-0431-x

摘要: The various forms of uncertainty that firms may face in bankable emission permit trading markets will affect firms’ decision making as well as their market performance. This research explores the effect of increased uncertainty over future input costs and output prices on the temporal distribution of emission. In a dynamic programming setting, the permit price is a convex function of stochastic prices of coal and electricity. Increased uncertainty about future market conditions increases the expected permit price and causes a risk neutral firm to reduce ex ante emissions in order to smooth out marginal abatement costs over time. Finally, safety valves, both low-side and high-side, are suggested to reduce the impact of uncertainty in bankable emission trading markets.

关键词: uncertainty     bankable     emission trading     market performance    

Key uncertainty events impacting on the completion time of highway construction projects

Alireza MOGHAYEDI, Abimbola WINDAPO

《工程管理前沿(英文)》 2019年 第6卷 第2期   页码 275-298 doi: 10.1007/s42524-019-0022-7

摘要: This paper examines the uncertainty events encountered in the process of constructing highways, and evaluates their impact on construction time, on highway projects in South Africa. The rationale for this examination stems from the view held by scholars that the construction of highways is a complex process, taking place in changing environments and often beset by uncertainties; and that there is a lack of appropriate evaluation of these uncertainty events occurring during the construction process. The research made use of a review of extant literature in the area of uncertainty management, and modeling in infrastructure projects, to guide the direction of the study. The inquiry process consisted of brainstorming by highway experts and interviewing them to identify the uncertainty factors that impact construction time. An uncertainty matrix for South African highway projects was developed, using a quantitative model and descriptive statistics. It emerged from the study that the uncertainty events affecting the construction time of highway projects are distributed across economic, environmental, financial, legal, political, social and technical factors. Also, it was found that each factor might account for several uncertainty events which impact on construction time differently, through a combination of the uncertainty events of the individual construction activities. Based on the obtained data, an Adaptive Neuro Fuzzy Inference System (ANFIS) has been developed, as a simple, reliable and accurate advanced machine learning technique to assess the impact of uncertainty events on the completion time of highway construction projects. To validate the ANFIS model, the Stepwise Regression (SR) models have been designed and their results are compared with the results of the ANFIS. Based on the predicted impact size of uncertainty events on the time of highway projects, it can be concluded that construction time on South African highway projects is significantly related to the social and technical uncertainties factors.

关键词: ANFIS     construction time     impact assessment     highway project     South Africa     uncertainty    

Estimation of composite load model with aggregate induction motor dynamic load for an isolated hybrid

Nitin Kumar SAXENA,Ashwani Kumar SHARMA

《能源前沿(英文)》 2015年 第9卷 第4期   页码 472-485 doi: 10.1007/s11708-015-0373-7

摘要: It is well recognized that the voltage stability of a power system is affected by the load model and hence, to effectively analyze the reactive power compensation of an isolated hybrid wind-diesel based power system, the loads need to be considered along with the generators in a transient analysis. This paper gives a detailed mathematical modeling to compute the reactive power response with small voltage perturbation for composite load. The composite load is a combination of the static and dynamic load model. To develop this composite load model, the exponential load is used as a static load model and induction motors (IMs) are used as a dynamic load model. To analyze the dynamics of IM load, the fifth, third and first order model of IM are formulated and compared using differential equations solver in Matlab coding. Since the decentralized areas have many small consumers which may consist large numbers of IMs of small rating, it is not realistic to model either a single large rating unit or all small rating IMs together that are placed in the system. In place of using a single large rating IM, a group of motors are considered and then the aggregate model of IM is developed using the law of energy conservation. This aggregate model is used as a dynamic load model. For different simulation studies, especially in the area of voltage stability with reactive power compensation of an isolated hybrid power system, the transfer function of the composite load is required. The transfer function of the composite load is derived in this paper by successive derivation for the exponential model of static load and for the fifth and third order IM dynamic load model using state space model.

关键词: isolated hybrid power system (IHPS)     composite load model     static load     dynamic load     induction motor load model     aggregate load    

广义不确定性系统理论的外延综论

王清印,吕瑞华

《中国工程科学》 2005年 第7卷 第10期   页码 16-22

摘要:

在概述广义不确定性系统内涵基础上,讨论了广义不确定性系统的外延类别及其相关理论的基本研究框架和基本原理,为深入研究广义不确定性系统理论奠定了基础。

关键词: 广义不确定性信息(GUI)     不确定性数学(UM)     广义不确定性系统理论(GUST)    

Uncertainty of concrete strength in shear and flexural behavior of beams using lattice modeling

《结构与土木工程前沿(英文)》 2023年 第17卷 第2期   页码 306-325 doi: 10.1007/s11709-022-0890-5

摘要: This paper numerically studied the effect of uncertainty and random distribution of concrete strength in beams failing in shear and flexure using lattice modeling, which is suitable for statistical analysis. The independent variables of this study included the level of strength reduction and the number of members with reduced strength. Three levels of material deficiency (i.e., 10%, 20%, 30%) were randomly introduced to 5%, 10%, 15%, and 20% of members. To provide a database and reliable results, 1000 analyses were carried out (a total of 24000 analyses) using the MATLAB software for each combination. Comparative studies were conducted for both shear- and flexure-deficit beams under four-point loading and results were compared using finite element software where relevant. Capability of lattice modeling was highlighted as an efficient tool to account for uncertainty in statistical studies. Results showed that the number of deficient members had a more significant effect on beam capacity compared to the level of strength deficiency. The scatter of random load-capacities was higher in flexure (range: 0.680–0.990) than that of shear (range: 0.795–0.996). Finally, nonlinear regression relationships were established with coefficient of correlation values (R2) above 0.90, which captured the overall load–deflection response and level of load reduction.

关键词: lattice modeling     shear failure     flexural failure     uncertainty     deficiency     numerical simulation    

Calculation method of load distribution on pipe threaded connections under tension load

Shoujun CHEN, Lianxin GAO, Qi AN

《机械工程前沿(英文)》 2011年 第6卷 第2期   页码 241-248 doi: 10.1007/s11465-011-0219-x

摘要:

This paper presents a new calculation method that can calculate the load distribution on pipe threaded connections under tension load. On the basis of elastic mechanics, the new method was developed by analyzing each thread tooth, and a new deformation and covariant equation by making a mechanics analysis on each thread tooth was obtained. Compared with the traditional method proposed by the previous references, the new deformation and covariant equation could be used to describe the relation between the previous and the next thread tooth. By applying the new method on the sample of P-110S pipe threaded connection, the obtained results show that the load on thread tooth mainly concentrates on the four or five threads engaged and the middle teeth were not utilized well to bear the loads. The model offers a new way to calculate the loads carried on the thread teeth under tension load.

关键词: load distribution     calculation method     pipe threaded connections     tension load    

Comparison of optimal capacitor placement methods in radial distribution system with load growth andZIP load model

Veera Venkata Satya Naryana MURTY, Ashwani KUMAR

《能源前沿(英文)》 2013年 第7卷 第2期   页码 197-213 doi: 10.1007/s11708-013-0249-7

摘要: In this paper, a combined power loss sensitivity (PLS) index-based approach is proposed to determine the optimal location of the capacitors in the radial distribution system (RDS) based on the real and reactive combined loss sensitivity index, as capacitor placement not only reduces real power loss with voltage profile improvement but also reduces reactive power loss due to the reactive power compensation in the network. The results have been obtained with the existing methods of power loss index (PLI) and index vector (IV) method for comparison. Besides, the optimal placement has been obtained with the proposed method as well as existing methods and the total kVar support has been obtained. In addition, the results of net cost savings for the 10-, 34-, and 69-bus systems are obtained for comparison. Moreover, the results have been obtained for a large system of 85 buses to validate the results with combined sensitivity based approach. Furthermore, the load growth factor has been considered in the study which is essential for the planning and expansion of the existing systems, whereas the impact of the realistic load model as ZIP load model has been considered for the study of all the systems.

关键词: load growth     load models     reactive power compensation     radial distribution system     power loss index (PLI)     power loss sensitivity (PLS)     index vector (IV)    

Evaluation of measurement uncertainty of the high-speed variable-slit system based on the Monte Carlo

Yin ZHANG, Jianwei WU, Kunpeng XING, Zhongpu WEN, Jiubin TAN

《机械工程前沿(英文)》 2020年 第15卷 第4期   页码 517-537 doi: 10.1007/s11465-020-0589-z

摘要: This paper presents a dynamic and static error transfer model and uncertainty evaluation method for a high-speed variable-slit system based on a two-dimensional orthogonal double-layer air-floating guide rail structure. The motion accuracy of the scanning blade is affected by both the moving component it is attached to and the moving component of the following blade during high-speed motion. First, an error transfer model of the high-speed variable-slit system is established, and the influence coefficients are calculated for each source of error associated with the accuracy of the blade motion. Then, the maximum range of each error source is determined by simulation and experiment. Finally, the uncertainty of the blade displacement measurement is evaluated using the Monte Carlo method. The proposed model can evaluate the performance of the complex mechanical system and be used to guide the design.

关键词: air-floating guide rail     error transfer model     driving and following structure     dynamic error     uncertainty evaluation     Monte Carlo method    

temperature in automotive engines over coldstart operation in the presence of different random noises and uncertainty

Nasser L. AZAD,Ahmad MOZAFFARI

《机械工程前沿(英文)》 2015年 第10卷 第4期   页码 405-412 doi: 10.1007/s11465-015-0354-x

摘要:

The main scope of the current study is to develop a systematic stochastic model to capture the undesired uncertainty and random noises on the key parameters affecting the catalyst temperature over the coldstart operation of automotive engine systems. In the recent years, a number of articles have been published which aim at the modeling and analysis of automotive engines’ behavior during coldstart operations by using regression modeling methods. Regarding highly nonlinear and uncertain nature of the coldstart operation, calibration of the engine system’s variables, for instance the catalyst temperature, is deemed to be an intricate task, and it is unlikely to develop an exact physics-based nonlinear model. This encourages automotive engineers to take advantage of knowledge-based modeling tools and regression approaches. However, there exist rare reports which propose an efficient tool for coping with the uncertainty associated with the collected database. Here, the authors introduce a random noise to experimentally derived data and simulate an uncertain database as a representative of the engine system’s behavior over coldstart operations. Then, by using a Gaussian process regression machine (GPRM), a reliable model is used for the sake of analysis of the engine’s behavior. The simulation results attest the efficacy of GPRM for the considered case study. The research outcomes confirm that it is possible to develop a practical calibration tool which can be reliably used for modeling the catalyst temperature.

关键词: automotive engine     calibration     coldstart operation     Gaussian process regression machine (GPRM)     uncertainty and random noises    

广义不确定性系统理论的基本构思

王清印,郭立田,谢建华,刘志勇

《中国工程科学》 2004年 第6卷 第3期   页码 25-29

摘要:

论述了不确定性系统理论的国内外发展概况,给出了不确定性信息定义及其广义不确定性系统理论(GUST)的定义,论述了广义不确定性系统理论的基本内涵、基本结构及其科学意义。

关键词: 不确定性信息     广义不确定性系统     基本结构    

Probabilistic seismic response and uncertainty analysis of continuous bridges under near-fault ground

Hai-Bin MA, Wei-Dong ZHUO, Davide LAVORATO, Camillo NUTI, Gabriele FIORENTINO, Giuseppe Carlo MARANO, Rita GRECO, Bruno BRISEGHELLA

《结构与土木工程前沿(英文)》 2019年 第13卷 第6期   页码 1510-1519 doi: 10.1007/s11709-019-0577-8

摘要: Performance-based seismic design can generate predictable structure damage result with given seismic hazard. However, there are multiple sources of uncertainties in the seismic design process that can affect desired performance predictability. This paper mainly focuses on the effects of near-fault pulse-like ground motions and the uncertainties in bridge modeling on the seismic demands of regular continuous highway bridges. By modeling a regular continuous bridge with OpenSees software, a series of nonlinear dynamic time-history analysis of the bridge at three different site conditions under near-fault pulse-like ground motions are carried out. The relationships between different Intensity Measure (IM) parameters and the Engineering Demand Parameter (EDP) are discussed. After selecting the peak ground acceleration as the most correlated IM parameter and the drift ratio of the bridge column as the EDP parameter, a probabilistic seismic demand model is developed for near-fault earthquake ground motions for 3 different site conditions. On this basis, the uncertainty analysis is conducted with the key sources of uncertainty during the finite element modeling. All the results are quantified by the “swing” base on the specific distribution range of each uncertainty parameter both in near-fault and far-fault cases. All the ground motions are selected from PEER database, while the bridge case study is a typical regular highway bridge designed in accordance with the Chinese Guidelines for Seismic Design of Highway Bridges. The results show that PGA is a proper IM parameter for setting up a linear probabilistic seismic demand model; damping ratio, pier diameter and concrete strength are the main uncertainty parameters during bridge modeling, which should be considered both in near-fault and far-fault ground motion cases.

关键词: continuous bridge     probabilistic seismic demand model     Intensity Measure     near-fault     uncertainty    

标题 作者 时间 类型 操作

Shape design of arch dams under load uncertainties with robust optimization

Fengjie TAN, Tom LAHMER

期刊论文

Robust topology optimization of multi-material lattice structures under material and load uncertainties

Yu-Chin CHAN, Kohei SHINTANI, Wei CHEN

期刊论文

A refined risk explicit interval linear programming approach for optimal watershed load reduction withobjective-constraint uncertainty tradeoff analysis

Pingjian YANG,Feifei DONG,Yong LIU,Rui ZOU,Xing CHEN,Huaicheng GUO

期刊论文

MPC-based interval number optimization for electric water heater scheduling in uncertain environments

Jidong WANG, Chenghao LI, Peng LI, Yanbo CHE, Yue ZHOU, Yinqi LI

期刊论文

Modeling the impact of uncertainty in emissions trading markets with bankable permits

Yongliang ZHANG, Bing ZHANG, Jun BI, Pan HE

期刊论文

Key uncertainty events impacting on the completion time of highway construction projects

Alireza MOGHAYEDI, Abimbola WINDAPO

期刊论文

Estimation of composite load model with aggregate induction motor dynamic load for an isolated hybrid

Nitin Kumar SAXENA,Ashwani Kumar SHARMA

期刊论文

广义不确定性系统理论的外延综论

王清印,吕瑞华

期刊论文

Uncertainty of concrete strength in shear and flexural behavior of beams using lattice modeling

期刊论文

Calculation method of load distribution on pipe threaded connections under tension load

Shoujun CHEN, Lianxin GAO, Qi AN

期刊论文

Comparison of optimal capacitor placement methods in radial distribution system with load growth andZIP load model

Veera Venkata Satya Naryana MURTY, Ashwani KUMAR

期刊论文

Evaluation of measurement uncertainty of the high-speed variable-slit system based on the Monte Carlo

Yin ZHANG, Jianwei WU, Kunpeng XING, Zhongpu WEN, Jiubin TAN

期刊论文

temperature in automotive engines over coldstart operation in the presence of different random noises and uncertainty

Nasser L. AZAD,Ahmad MOZAFFARI

期刊论文

广义不确定性系统理论的基本构思

王清印,郭立田,谢建华,刘志勇

期刊论文

Probabilistic seismic response and uncertainty analysis of continuous bridges under near-fault ground

Hai-Bin MA, Wei-Dong ZHUO, Davide LAVORATO, Camillo NUTI, Gabriele FIORENTINO, Giuseppe Carlo MARANO, Rita GRECO, Bruno BRISEGHELLA

期刊论文